Line 29: Line 29:
* Since the time stamps are in UTC, the correct time here (Kingston) is UTC time minus 5 hours.
* Since the time stamps are in UTC, the correct time here (Kingston) is UTC time minus 5 hours.


* [[File:Mech 425 ECM Review Lecture 17th and 18th.pdf|Mech 425 ECM Review Lecture 17th and 18th]]
* '''Revised ECMs due Friday Feb. 19th at 8:30 am:'''[[File:Mech 425 ECM Review Lecture 17th and 18th.pdf|Mech 425 ECM Review Lecture 17th and 18th]]
Upload to Appropedia with summary of edits. Kadra will review from there and reload file if additional corrections are needed. Send her confirmation email at time of reload.


== Pre-designed ECMs==
== Pre-designed ECMs==

Revision as of 03:10, 18 February 2010

Template:425inprogress

This page is for Green IT projects for Mech 425. You can download the 14 page project File:MECH425 green ITS Project Final Jan 20.doc in doc format. Thus you can edit the consent forms, etc.

For more information see Category:Queens Green IT and Hardware replaced by a smartphone

Through Queen`s University`s Department of Mechanical and Materials Engineering course Mech425, students are developing an open source database of energy conservation measures (ECMs) which can be used to evaluate the economic and environmental benefits of numerous technologies, systems, and processes. By quantifying the economic and environmental benefits in a standard and transparent form, it is hoped that these ECMs will provide businesses and homeowners with reliable information to assess the feasibility of improving their environmental impact, and simultaneously, their bottom line.

See also: http://www.business.gov/expand/green-business/energy-efficiency/calculate-savings/energy-saving-calculator.html

To keep people from editing your work - please put the following: {{425inprogress|Month Day, Year}}

IMPORTANT

  • Submit ECM and finish page by Feb. 9 midnight
  • Do peer review of topic page and ECM by Feb. 11 in class (8.30 am) This is an individual mark and ensure comments on both the topic and ECM are in the discussion tab of the page. Signing it shows how well each member is working or that it was done. You can split it up or do as a group - ensure I see a signature if individual or "done be group ----names----". If you have concerns about group members not pulling their weight, please discuss with the instructor.

The individual mark is for doing the review for another group. The group will be given a mark for using the review that another group's members has done for you and correcting your Appropedia page and ECM.

  • Review your ECM and page and resubmit by Feb. 12 midnight
  • If you need to make an appointment to see Kadra, she will be available only by appointment on:

Feb. 11th 2:30 - 4:00 pm, Feb. 12th 1:00 - 3:30pm

  • Marks and comments will be available in class after marking on Feb. 17th and Feb 18th. Ensure at least one group member is there. You must be present to receive your mark.
  • Some of you had trouble uploading Microsoft files because of corruption issues -- Appropedia now supports all the Open Office formats -- odt, ods, odp, odg, odb. You can download Open Office for free here.
  • Since the time stamps are in UTC, the correct time here (Kingston) is UTC time minus 5 hours.
  • Revised ECMs due Friday Feb. 19th at 8:30 am:Mech 425 ECM Review Lecture 17th and 18th

Upload to Appropedia with summary of edits. Kadra will review from there and reload file if additional corrections are needed. Send her confirmation email at time of reload.

Pre-designed ECMs

Topics

Hardware based Topics

(Please place in alphabetical order)

Software based Topics

Please place Green IT project in alphabetical order

Resources

Check and use the discussion tab for helpful hints and discussions.

This category currently contains no pages or media.

Cookies help us deliver our services. By using our services, you agree to our use of cookies.