==Background==
==Abstract==
[[File:Remediation hillside swaleswlogs.JPG|thumb|right]]
The Remediation Hillside is an Engineering 305 ([[Engr 305]]) project at [[Humboldt State University]], created for the Campus Center for Appropriate Technology ([[CCAT]]) by [[User:Eric_Haas|Eric Haas]]. The aim of the project is to both demonstrate the usefulness and appropriateness of swale design in order to better utilize garden space, and also to turn the hillside into a space that can be utilized for years into the future by CCAT. The hillside will be reinforced against erosion caused by rainwater runoff and wind, and will become an aesthetically pleasing fixture for the [[CCAT]] grounds.  In addition, from a remediation standpoint, the swales will sequester harmful pollutants that may run off from the parking lot located above the site.


This project will involve turning an unused hillside at [[CCAT]] into a useful space for growing plants, and also to stabilize the nearby hillside against possible erosionThe plot will also be landscaped to be aesthetically pleasing and to more fully integrate it with the rest of CCAT.
==Costs==
This project is to be completed almost entirely with materials readily available at CCAT,and all of the labor required will be from CCAT volunteers.  While most of the plants utilized will be transplanted from CCAT's gardens.
===Criteria===
These criteria were chosen as the most important to the project and given a weight from 0 to 10, with 10 being the most important.
{| class="wikitable sortable"
|-
! Criteria
! Constraints
! Weight (0-10)
|-
| Upkeep Required
| Must require as little upkeep as possible
| 6
|-
| Completion Time
| Must be completed within allotted time frame
| 8
|-
| Aesthetics
| Must fit in with the natural beauty of the CCAT property
| 9
|-
| Appropriate Technology
| Must be made using appropriate methods
| 10
|-
| Local
| Plants used should reflect local flora and native species to the area
| 7
|}
==Design==
===Surveying===
After the hillside was first cleared of major brush, the plot of land to be turned into the Remediation Hillside was given a very basic survey using an [[The 'A' frame (Practical Action Brief)|A-Frame]] to measure distances and angles.  The hillside was divided by three lines running parallel with the hillside, and using basic trigonometry the distance at each point was determined.  The result of this survey was a very basic dimension map of the hillside.
<gallery>
File: Remediation hillside map.jpg|A hand-drawn graph showing the hillside's dimensions (not to scale)
</gallery>
===Swale Placement and Plant Selection===
Each [[swale]] was dug such that large sections of decomposing wood could be fitted inside, which will both reinforce the hillside from erosion and provide nutrients for plants growing on the hillside.  As they decompose, they also absorb water that trickles through the dirt, acting effectively as a large sponge that will provide the plants with a constant source of moisture through their rootsAfter some consideration of cost and efficiency, it was decided that both swales were to be planted with local Sword Ferns.  Ferns are already present at the site and are profusely common in the area, making them ideal candidates for this site.  Several already-existing ferns will also become part of the hillside.


The project will be finished over the course of the Spring 2011 semester.
==Construction==
===Preparation and Digging===
The first step in shaping the hillside was to remove the layer of duff and forest litter that covered the hillside.  This material was saved, so that it could later be replaced when the major digging for the project was done.  Once the entire area was down to bare dirt, the two [[swales]] were dug horizontally across the slope, along the two top contour lines.  This placed each swale roughly 5 feet apart. Each swale was roughly one and one-half of a shovel's blade in depth, and about a shovel blade's width across, though certain sections were made larger to accommodate larger logs.  Large rocks and sticks were manually removed from the dirt as it was brought up, and  was then shoveled into a long wall directly adjacent to the ditch on the downhill side.  As it was created, the wall was periodically tamped with shovels to ensure that it did not fall apart or slide into the lower swale, and was gradually built up with dirt until it was roughly a foot above ground level.


==Objective==
===Final Setup===
After each swale was completed, decomposing logs were chosen and laid end-to-end in the trenches, then filled with dirt from the uphill slope above each swale, as well as dirt taken from various locations around CCAT. Each swale was filled with enough dirt to cover the logs to a depth of about 4 inches, creating the planting bed that the swales were made to house.  At this time, the stored duff was raked back into place, covering the entire site except for the planting beds.  The ground cover will keep the swale walls from eroding dur to wind and rain, and aid in decomposition as well as providing a habitat for helpful insects and organisms.  Sword ferns were planted along each swale and the surrounding dirt covered in straw.


<gallery>
File: Remediation hillside trenches.JPG|The hillside from the front, with duff removed
File: Remediation hillside swaleswlogs.JPG|The swales from the side, showing the logs in place and ready to be buried
File: Remediation hillside swalewall.JPG|Side view of the swale wall
File: Remediation hillside plant1.JPG|A planet fern with hole showing the buried log underneath
File: Remediation hillside trench1.JPG|Top view of completed swales
File: Remediation hillside topview.JPG|View of completed swales from hilltop
File: Remediation hillside straw.JPG|Close-up of straw covering on planting beds
</gallery>
==Next Steps==
The hillside requires little in the way of maintenance , other than basic weeding and garden upkeep that is already performed at CCAT regularly.  In the future, several long-term plans could be considered:
*The swales could be extended to further cover the hillside
*New plants could be planted in place of the ferns if needed
*The swale walls could be reinforced to provide for a better barrier against water intrusion
Overall, the project is open to whatever is needed by the staff at CCAT and its exact long-term plans are based on what it is to be utilized for.
==Conclusion==
The Remediation Hillside is always to be a work in progress, and it will serve as a probably launching-off point for future projects at CCAT.  The scale and variety of the project had to be scaled back due to time and weather constraints, as a good deal of time was lost to poor weather conditions.  In addition, a greater number of people working on the site would have sped up the process greatly, which would have made the impact of weather far less of a barrier.
==Literature Review==
===Mulching===
The areas where plants are to be grown can be mulched in order to add nutrients to the soil, which is primarily clay throughout most of the hillside.  Mulch can be created from shredded newspaper<ref>Pellett, Norman E. and Heleba, David A. 1995 "Chopped Newspaper for Weed Control in Nursery Crops" ''J. Environmental Horticulture'' 13(2): 77-81.</ref>, certain types of plastics, and other natural materials to cover the ground and prevent weeds from spreading.<ref>Whitefield, Patrick. 2002 ''How To Make A Forest Garden''. White River Junction: Chelsea Green Publishing Company.</ref>  For this project, mulch will be spread over the entire remediation zone to prevent incursion by weeds, with gaps left for the plants that will be planted at various places called 'Grow-through mulch'.  This will not only allow plants to grow but will serve as a spot that organic materials can be disposed of and utilized as new mulch for the remediation area.
===Composting===
Along with the mulch for surface cover, the soil where plants are to be planted will be supplemented with organic compost made from local organic waste.  This compost can be provided by both [[CCAT]] and the [[Humboldt State University]] campus.  Organic wastes such as grass clippings, vegetable matter from kitchens, and old newspapers can all be mixed with the soil to provide nutrients for plants.  Redwood logs provided by CCAT can also be buried beneath the plant beds before planting in order to provide nutrients and warmth from decomposition.<ref>Campbell, Stu. 1990 ''Let It Rot!''. United States: R.R. Donnelley</ref>
===Plant Selection===
The plants chosen for the remediation site will be nothing but native plants<ref>Smith, James Payne. 1972 ''Campus Flora Atlas''. Arcata: Humboldt State University Department of Biology</ref>, with a preference given to ones that can be transplanted from CCAT grounds instead of newly-purchased ones.  As the area is heavily shaded, special consideration needs to be taken to choose the right plants for the amount of solar energy available.  A [[Solar Pathfinder]] will be used to determine average sun for each area, and local plants such as Sword Ferns<ref>Hoshizaki, Barbara Joe and Robbin C. Moran. 2001. ''Fern Grower's Manual''. Portland: Timber Press.</ref> and other forest plantlife will be planted around the beds.<ref>Morse, Harriet K. 1962 ''Gardening In The Shade''. New York: Charles Scribner's Sons</ref>
==References==
<references />
[[Category:Engr305 Appropriate Technology]]
[[Category:Engr305 Appropriate Technology]]
[[Category:CCAT|R]]

Revision as of 04:08, 6 March 2018

Template:TOCleft

Abstract

Remediation hillside swaleswlogs.JPG

The Remediation Hillside is an Engineering 305 (Engr 305) project at Humboldt State University, created for the Campus Center for Appropriate Technology (CCAT) by Eric Haas. The aim of the project is to both demonstrate the usefulness and appropriateness of swale design in order to better utilize garden space, and also to turn the hillside into a space that can be utilized for years into the future by CCAT. The hillside will be reinforced against erosion caused by rainwater runoff and wind, and will become an aesthetically pleasing fixture for the CCAT grounds. In addition, from a remediation standpoint, the swales will sequester harmful pollutants that may run off from the parking lot located above the site.

Costs

This project is to be completed almost entirely with materials readily available at CCAT,and all of the labor required will be from CCAT volunteers. While most of the plants utilized will be transplanted from CCAT's gardens.

Criteria

These criteria were chosen as the most important to the project and given a weight from 0 to 10, with 10 being the most important.

Criteria Constraints Weight (0-10)
Upkeep Required Must require as little upkeep as possible 6
Completion Time Must be completed within allotted time frame 8
Aesthetics Must fit in with the natural beauty of the CCAT property 9
Appropriate Technology Must be made using appropriate methods 10
Local Plants used should reflect local flora and native species to the area 7

Design

Surveying

After the hillside was first cleared of major brush, the plot of land to be turned into the Remediation Hillside was given a very basic survey using an A-Frame to measure distances and angles. The hillside was divided by three lines running parallel with the hillside, and using basic trigonometry the distance at each point was determined. The result of this survey was a very basic dimension map of the hillside.

Swale Placement and Plant Selection

Each swale was dug such that large sections of decomposing wood could be fitted inside, which will both reinforce the hillside from erosion and provide nutrients for plants growing on the hillside. As they decompose, they also absorb water that trickles through the dirt, acting effectively as a large sponge that will provide the plants with a constant source of moisture through their roots. After some consideration of cost and efficiency, it was decided that both swales were to be planted with local Sword Ferns. Ferns are already present at the site and are profusely common in the area, making them ideal candidates for this site. Several already-existing ferns will also become part of the hillside.

Construction

Preparation and Digging

The first step in shaping the hillside was to remove the layer of duff and forest litter that covered the hillside. This material was saved, so that it could later be replaced when the major digging for the project was done. Once the entire area was down to bare dirt, the two swales were dug horizontally across the slope, along the two top contour lines. This placed each swale roughly 5 feet apart. Each swale was roughly one and one-half of a shovel's blade in depth, and about a shovel blade's width across, though certain sections were made larger to accommodate larger logs. Large rocks and sticks were manually removed from the dirt as it was brought up, and was then shoveled into a long wall directly adjacent to the ditch on the downhill side. As it was created, the wall was periodically tamped with shovels to ensure that it did not fall apart or slide into the lower swale, and was gradually built up with dirt until it was roughly a foot above ground level.

Final Setup

After each swale was completed, decomposing logs were chosen and laid end-to-end in the trenches, then filled with dirt from the uphill slope above each swale, as well as dirt taken from various locations around CCAT. Each swale was filled with enough dirt to cover the logs to a depth of about 4 inches, creating the planting bed that the swales were made to house. At this time, the stored duff was raked back into place, covering the entire site except for the planting beds. The ground cover will keep the swale walls from eroding dur to wind and rain, and aid in decomposition as well as providing a habitat for helpful insects and organisms. Sword ferns were planted along each swale and the surrounding dirt covered in straw.


Next Steps

The hillside requires little in the way of maintenance , other than basic weeding and garden upkeep that is already performed at CCAT regularly. In the future, several long-term plans could be considered:

  • The swales could be extended to further cover the hillside
  • New plants could be planted in place of the ferns if needed
  • The swale walls could be reinforced to provide for a better barrier against water intrusion

Overall, the project is open to whatever is needed by the staff at CCAT and its exact long-term plans are based on what it is to be utilized for.

Conclusion

The Remediation Hillside is always to be a work in progress, and it will serve as a probably launching-off point for future projects at CCAT. The scale and variety of the project had to be scaled back due to time and weather constraints, as a good deal of time was lost to poor weather conditions. In addition, a greater number of people working on the site would have sped up the process greatly, which would have made the impact of weather far less of a barrier.

Literature Review

Mulching

The areas where plants are to be grown can be mulched in order to add nutrients to the soil, which is primarily clay throughout most of the hillside. Mulch can be created from shredded newspaper[1], certain types of plastics, and other natural materials to cover the ground and prevent weeds from spreading.[2] For this project, mulch will be spread over the entire remediation zone to prevent incursion by weeds, with gaps left for the plants that will be planted at various places called 'Grow-through mulch'. This will not only allow plants to grow but will serve as a spot that organic materials can be disposed of and utilized as new mulch for the remediation area.

Composting

Along with the mulch for surface cover, the soil where plants are to be planted will be supplemented with organic compost made from local organic waste. This compost can be provided by both CCAT and the Humboldt State University campus. Organic wastes such as grass clippings, vegetable matter from kitchens, and old newspapers can all be mixed with the soil to provide nutrients for plants. Redwood logs provided by CCAT can also be buried beneath the plant beds before planting in order to provide nutrients and warmth from decomposition.[3]

Plant Selection

The plants chosen for the remediation site will be nothing but native plants[4], with a preference given to ones that can be transplanted from CCAT grounds instead of newly-purchased ones. As the area is heavily shaded, special consideration needs to be taken to choose the right plants for the amount of solar energy available. A Solar Pathfinder will be used to determine average sun for each area, and local plants such as Sword Ferns[5] and other forest plantlife will be planted around the beds.[6]

References

  1. Pellett, Norman E. and Heleba, David A. 1995 "Chopped Newspaper for Weed Control in Nursery Crops" J. Environmental Horticulture 13(2): 77-81.
  2. Whitefield, Patrick. 2002 How To Make A Forest Garden. White River Junction: Chelsea Green Publishing Company.
  3. Campbell, Stu. 1990 Let It Rot!. United States: R.R. Donnelley
  4. Smith, James Payne. 1972 Campus Flora Atlas. Arcata: Humboldt State University Department of Biology
  5. Hoshizaki, Barbara Joe and Robbin C. Moran. 2001. Fern Grower's Manual. Portland: Timber Press.