The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 206: | Line 206: | ||
| Time sheet 3, Project photos (1st day back), Make materials list and begin formulating building plans | | Time sheet 3, Project photos (1st day back), Make materials list and begin formulating building plans | ||
|- | |- | ||
| 3/ | | 3/23/2020 | ||
| Timesheet 4, Most construction done, Start to check over criteria, Begin touch up | | Timesheet 4, Most construction done, Start to check over criteria, Begin touch up | ||
|- | |- | ||
| 4/13/2020 | | 4/13/2020 | ||
| Timesheet 5, | | Timesheet 5, Appropeda Draft, Finish touch up, Follow up with CCAT about there increased storage and new filter | ||
|- | |- | ||
| 4/27/2020 | | 4/27/2020 |