Image:con6.jpg|Different placement for the storage of the caught rainwater ''prototype stage'' | Image:con6.jpg|Different placement for the storage of the caught rainwater ''prototype stage'' | ||
Image:con7.jpg|Originally we had the storage units on a wood pallet, this didn't last because the weight of the storage proved to be too much for the integrity of the wood ''prototype stage'' | Image:con7.jpg|Originally we had the storage units on a wood pallet, this didn't last because the weight of the storage proved to be too much for the integrity of the wood ''prototype stage'' | ||
Image:con4.5.jpg| | Image:con4.5.jpg|Convaience system that was found at CCAT that we were able to reuse for this project ''construction'' | ||
Image:con9.jpg|The gutter system ending over the placement of the conveyance system so the water flows directly into it ''construction'' | Image:con9.jpg|The gutter system ending over the placement of the conveyance system so the water flows directly into it ''construction'' | ||
Image:con10.jpg|The final placement of conveyance system for the project ''final design'' | Image:con10.jpg|The final placement of conveyance system for the project ''final design'' |