Our ENGR305 team chooses to help the farm rebuild their solar hot water heater for the outdoor sink and vegetable washing station. It was disassembled and never rebuilt; we will determine what parts are in working order and possibly improve the system if it is easy to get back in working condition.
Our ENGR305 team chooses to help the farm rebuild their solar hot water heater for the outdoor sink and vegetable washing station. It was disassembled and never rebuilt; we will determine what parts are in working order and possibly improve the system if it is easy to get back in working condition.
 


==Problem statement==
==Problem statement==

Revision as of 23:27, 2 February 2014

Template:305inprogress

Background

Bayside Park Farm is a local CSA, (Community-Supported Agriculture establishment) which is supported by the community and provides fresh organic produce to members and shareholders. Bayside was formed by Humboldt State Professors, started farming in 1993 and was the first CSA in Arcata. It is also a community park and demonstration site for permaculture farming and appropriate technology. Bayside Park Farm is located on 930 Old Arcata Road.


Our ENGR305 team chooses to help the farm rebuild their solar hot water heater for the outdoor sink and vegetable washing station. It was disassembled and never rebuilt; we will determine what parts are in working order and possibly improve the system if it is easy to get back in working condition.

Problem statement

Start your project objective statement in the format, "The objective of this project is to...." Eventually you will list criteria here as well.

Criteria, Constraints, and Weights for the Bayside Park Farm solar hot water Project
Criteria Constraint Weight
Water temperature Warm enough to wash vegetables with, not hot enough to scald hands 5
Hot water duration /

Total heat capacity

At least 30 minutes of continual usage 5
Washing station

efficiency

Must be more efficient than the current kitchen sink 2
Maintenance /

documentation

Must be easy to understand by farm staff with no prior solar hot water experience and provide some trouble shooting information 5
Educational physical infrastructure Should provide signs and additional information on the project that the farmers can reference when giving tours. 4
Cost Should remain within budget. 3