− | Tables are hard to make in wiki.
| + | The costs of the project include design time, labor time and material costs. These costs are composed of first: a pie chart depicting the number of hours spent on each phase of the design process. Second: a table illustrating material costs. Third: a table depicting the potential costs of maintenance and repair. |