Constraints for exploitation
===Constraints for exploitation===
# A small hydroelectric powerplant is very expensive to install, around 1500 € to 3000 € per installed kW ***; operating costs are however quite low. The material is generally robust and lasts a lifetime if regular maintenance is exerciced for several decades. If we sign up for the perspective of a sustainable development, we should consider that in terms of the economic life-expectancy of the facility, the replacement of the facility will be incorporated by the users of the network agreeing to pay for the supplied power. The billing of the consumption allows to build up the needed capital for the maintenance and future replacement; it avoids abusive consumptions. About the pricing, it must be designed in function of the objectives of the powerplant project. About the pricing, we suggest progressive pricing (the more one consumes, the more the price per kW is increased, obviously within certain limits) which reduces the risk of waste, and sectorial pricing (collective or community consumptions are are charged at more favorable rates) ....*** HttpSee http://www.ciele.org/filieres/hydraulique.htm
# Operating costs are low if the facility is regularly maintained: the damaged parts are replaced quickly (stock of spare parts), abnormal wear is investigated to identify the causes. Losses on the network are eliminated without delay.
# Who says maintenance, says manager and personnel trained for the task at hand.
# Estimates of budget, deadline for implementation
From an average unit cost of 2000 €/kW installed, it is easy to estimate the investment budget for 10, 100 or 1000kW, as being € 20,000 to € 2,000,000. On the other hand, pico-powerplants of 300W are sold in Vietnam for U.S.D. $20 and are very popular.
It is likely that the complexity of a facility of more than 100kW extends the delay of realisation because of forgoing feasibility studies, which probably increases the quality and reliability of the project.Compact installation kits are sold in commerce, requiring only a minimum of know-how for the installation. This equipment series offers the advantage of being available quickly and to be well calibrated for operating conditions. Unless you have control of all parameters (location, project funding, expertise for the construction of infrastructure), an installation project requires several years between the first sketches on paper and the effective operation of the distribution network.
# Small powerplants and local development.
Many places on earth are not yet equipped with electric network due to lack of interest (economic or political) to install utilities. The low population density is one of the main reasons for this lack. A micro-powerplant offers a solution for decentralised development where the local undertaker or local authorities can act autonomously. A well designed and well maintained installation offers a very low return price, within the reach of small and medium enterprises. The social impact of these small facilities is considerable in the fight against poverty. See http://www.tve.org/ho/doc.cfm?aid=1636&lang=English