Changes

Jump to navigation Jump to search
Line 84: Line 84:     
== Timeline ==
 
== Timeline ==
===June 28th 2013===
+
'''June 28th 2013'''
 
Went to Las Malvinas to look at the school rainwater catchment system. Ended up with an alternative project to fix the rainwater catchment system in the Play.
 
Went to Las Malvinas to look at the school rainwater catchment system. Ended up with an alternative project to fix the rainwater catchment system in the Play.
   −
===June 29th 2013===
+
'''June 29th 2013'''
 
Bought materials for the rainwater catchment system in the Play in Las Malvinas.
 
Bought materials for the rainwater catchment system in the Play in Las Malvinas.
 
Fixed the toilet/sink system, and first flush. The first screening still has to be modified.
 
Fixed the toilet/sink system, and first flush. The first screening still has to be modified.
   −
===June 30th 2013===
+
'''June 30th 2013'''
 
Started Construction on the Play rainwater catchment system.
 
Started Construction on the Play rainwater catchment system.
 
*Removed roof
 
*Removed roof
Line 98: Line 98:  
*Cleaned the tinaco
 
*Cleaned the tinaco
   −
===July 1st 2013===
+
'''July 1st 2013'''
 
*Rain
 
*Rain
   −
===July 2nd 2013===
+
'''July 2nd 2013'''
 
*Rain
 
*Rain
   −
===July 3rd 2013===
+
'''July 3rd 2013'''
 
*Worked on constructing the roof
 
*Worked on constructing the roof
 
*Worked on completing powerpoint for our project presentation
 
*Worked on completing powerpoint for our project presentation
   −
===July 4th 2013===
+
'''July 4th 2013'''
 
*Presentation on our projects
 
*Presentation on our projects
   −
===July 5th 2013===
+
'''July 5th 2013'''
 
*Sancocho and dancing in Las Malvinas
 
*Sancocho and dancing in Las Malvinas
   −
===July 6th 2013===
+
'''uly 6th 2013'''
 
*Installed the PVC gutters
 
*Installed the PVC gutters
 
*Drilled a hole into the cap of the tinaco for the PVC inlet
 
*Drilled a hole into the cap of the tinaco for the PVC inlet
 
*Created the primary screening
 
*Created the primary screening
 
*Finished constructing and gluing the first flush
 
*Finished constructing and gluing the first flush
===July 7th 2013===
+
 
 +
'''July 7th 2013'''
 
*Completed project with the addition of a faucet and adding silicone to a leak.
 
*Completed project with the addition of a faucet and adding silicone to a leak.
  
611

edits

Navigation menu