Locally Delicious school solar dehydrator instructions

115 bytes removed, 22:43, 3 May 2011
no edit summary
==== Procedure ====
#Cut plywood to 65“x 27”. This will be the base of the collector.
# Cut two pieces of 2 x 4 to 65” in length. Then cut two more pieces of 2 x 4 to 23” inches in length. The four pieces of 2 x4 will be the sides of the collector.
# Drill four two-inch holes, evenly spaced apart into one of the 27” piece of 2 x 4. This piece will be located at the front of collector where air will enter.
==== Procedure ====
# Remove the doors by unscrewing hinges. Leave cabinet doors off to the side.<br># Drill two holes with a diameter of two inches into each side near the very top on the side near cabinet opening. This will be where the moisture from the drying food will escape.<br># Drill three holes with a diameter of two inches into the back of the cabinet at the very bottom. This is where the collector will be connected and passing heat through.<br># Staple insulation inside the cabinet covering every surface area. Make sure to cut out holes to fit the holes already drilled into the cabinet.<br># Cut four pieces of 2 x 4 to fit the height of inside the cabinet. Drill screws into the 2 x 4 pieces connecting each to the four corners of the cabinet. This will be the foundation for the tray racks to be mounted on.<br># Cut ten pieces of 1x1 lumbers to 15 lengths that will be drilled onto the 2 x 4 in the cabinet. Drill a screw into the 1X1 pieces connecting them horizontally to the 2X4 pieces that were previously drilled. Separate by six inches to make 5 mounts on each side. These mounts are where the drying racks will slide into.<br># Now staple insulation onto the cabinet doors but do not screw them in yet.<br># Screw two pieces of 1 x 2 lumbers on top of cabinet, one against each outer side.<br># Make sure the cabinet has no oil based paint, if it does make sure to sand away all paint. <br>Then paint the cabinet with two coats of paint. Make sure to allow the first coat to dry before applying second coat. Next paint the cabinet doors as you are painting the cabinet.<br># Once the paint is finished drying completely, screw back in the cabinet doors.<br># Next use the extra glazing piece from the collector and screw into the 1 x 2 pieces of lumber on top of the cabinet. Make sure the glazing is covering the cabinet horizontally. This will be the roofing of the cabinet to protect the hinges from rain and rusting damage.<br># Cut two pieces of ¾” plywood to six inches in length and 3 inches in height to cover the top ventilation holes on the sides of the cabinet. These will be used for ventilation regulation by sliding back and forth to allow more or less air flow out of the cabinet.<br># Cut 8 pieces of ¾” plywood to 2” x 7”. These pieces will be the frame for the ventilation regulation.<br># Place the sliding piece centered over the cabinet outtake hole leveled with the ground and make eighth of an inch markings below and above the piece of wood.<br># Place one of the frame pieces directly below the bottom line made by the intake hole and another frame piece directly above the other line. <br># Place two other pieces of wood on top of and to the outside edge of the pieces just laid down.# Drill four screws into each corner of the frame in order to secure the frame.<br># Repeat the frame building process with the other cabinet ventilation outtake hole. <br># Cut 2 x 4 to 22 inches, then using a table saw cut a 45 degree angle section off the wood. This piece will be for the collector to mount on. Next screw the piece of wood with the shaved side facing up against into the cabinet below the 3 holes.<br>
==='''Base'''===
====Materials Required====
* 4 x 4 wood<br>* Plywood<br>* Acrylic glass( 1 x 4 lumber can be used as a substitute as it is easier to cut)<br>* Screws<br>* Screw driver<br>
====Procedure====
# Cut four pieces of 4 x 4 to 36” in length. These will be the legs for the base.<br># Cut plywood to 27” x 18”. The cabinet will rest on this plywood.<br># Cut 4 pieces of acrylic glass. 2 pieces will be 27” x 6 “and the other two will be 18” x 6”.<br># Screw plywood onto the four 4 x 4 pieces so that the base can stand freely. Next screw the pieces of acrylic glass onto the sides of the base so that the cabinet will be safely fastened into the base. Make sure two or three inches of acrylic glass are above the base of the plywood.<br>
==='''Drying Racks'''===
====Materials Required====
* 3 yards of nylon mesh<br>* Plywood<br>* Screws<br>* Staple gun and staples<br>
====Procedure====
# To make five racks for the dehydrator, cut 10 pieces of plywood of widths of 2” and lengths to fit the cabinet space. Then cut 10 pieces of plywood 1” less than the width of the cabinet space they will be placed in and with widths of 2”.<br># Cut 10 pieces of plywood 4” greater than the width of the longest piece cut in the last step.<br># Cut 10 pieces of plywood with widths of 2” and lengths 4” less than the width of the shortest piece cut in the first step in making the drying racks. Please note these lengths are extremely variable due to the different types of cabinets being available.<br># Place the two longest pieces made in the first step in building the drying racks parallel to each other.<br># Take the two other pieces from the first step in making the drying racks and place them on the ends of the parallel pieces.<br># Separate the parallel pieces until a frame is formed.<br># Take a staple gun and staple the attachment points of the frame to keep it in place.<br># Take nylon mesh and cut it to the dimensions of the frame that was just built.<br># Staple one side of the nylon mesh to a side of the frame containing one of the original parallel pieces.<br># Take one of the pieces of wood cut from the second bullet in the drying rack steps and screw it down to the side containing the stapled down nylon mesh with two screws on each corner and two other screws spaced at equal distances from each other.<br># Stretch the nylon to the other side of the frame and staple it down.<br># Take one of the other pieces of wood cut from the second bullet and screw this down to the frame in the same manner as the one before.<br># While stretching the nylon mesh over the other sides of the frame, staple down the mesh to the rest of the frame.<br># Take one of the pieces of wood cut from the third bulleted step and screw it down to the frame to secure the mesh on the other part of the structure in a similar fashion as before then do the same with the other side.<br># Cut of the excess nylon mesh from the drying rack.<br># Repeat the process for the rest of the racks.<br>
==='''Putting it Together'''===
====Materials Required====
* Screws<br>* 2 feet of aluminum ducting<br>* Screwdriver<br>* Wire cutters (to cut aluminum ducting)<br>* Aluminum Tape<br>
====Procedure====
# Lift cabinet and place on top of base. Make sure it is completely flat on the base and fits snugly. Next screw the bottom of the cabinet onto the base to ensure stability.<br># Stand collector up and lean against the back of the cabinet below the holes onto the 2 x 4. The legs should rest flat on the ground as well as the collector being at a 30-45 degree angle. Once the collector is placed in its final position, screw the edges of the collector into the 2 x 4.<br># Once the cabinet and collector are both stabilized and connected to one another, it is time to connect the aluminum ducting. Cut the 2 feet of ducting into three pieces. <br># Once 3 pieces are obtained, start by making sure the hole on the outside is completely covered by the ducting. Once covered, begin taping the outer edges with aluminum tape to seal completely ensuring no air escapes. After the hole is completely covered and sealed by the ducting, connect the other end of the ducting to the cabinet hole. Again make sure the ducting completely covers the hole and seal with the aluminum tape. <br># Repeat the previous step 2 more times so that the 3 holes of the collector are connected to the 3 holes of the cabinet.<br>