Changes

Jump to navigation Jump to search
Line 8: Line 8:     
== Understanding the Market ==
 
== Understanding the Market ==
To make bullets use the asterisk:
+
Most buildings contain the potential for great energy savings.  In order to exploit this potential, a number of economic factors must be considered.  These include (but are not limited to):
* Like this
+
* Initial/start-up cost
* and like this
+
* Savings potential
** and two for the next indent
+
* Equipment life
* and back to one...
+
* Payback period
   −
To make a numbered list use the pound sign:
+
Other considerations include the use of fuel and electricity.  Understanding the economic trends of these energy sources can be of great benefit.  For instance, if some equipment type have the capability of multiple fuel usage.  By prioritizing fuel consumption based on off-peak hour usage, savings can be had without the need of retrofit applications.  In situations where the equipment cannot be powered via multiple energy sources, the cost of replacement and/or retrofit must be weighed against the payback period of the device.  Often, cost and energy consumption can be reduced through the simple training of plant operators and the maintenance crew.
# Like this
  −
# and like this
      
== Project Requirements ==
 
== Project Requirements ==
334

edits

Navigation menu