Constructing the Drive Towers
Before You Begin[edit | edit source]
- The parts required for the Upper Platform are:
- Hardware:
- 3 - Segments of T5 Belt
- 6 - LM6UU Linear Bearings
- 3 - M3 x 10 Socket Cap Screw
- 3 - M3 x 20 Socket Cap Screw
- 6 - 1 Foot segments of 6mm Smooth Rod
- 24 - M3 x 16 Socket Cap Screw
- 51 - M3 Flat washers
- 27 - M3 Nuts
- 12 - Thin Zip Ties
- 3 - Thick Zip Ties
- Printed Parts:
- 3 - Carriage
- 3 - Short Belt Terminators
- 3 - Long Belt Terminators
- Required Tools:
- 1.5mm Allen Wrench
- 2.5mm Allen Wrench
- 5.5mm Combination wrench
- Needle Nose Pliers
- Recommended Tools:
- 3mm or 1/8” Drill bit
- Hardware:
This segment of build process is not available[edit | edit source]