Abstract
One paragraph summary of your project from background to discussion and next steps.
There should be an image near the top.
Background
Problem statement and criteria
Use sortable table.
Description of final project
Prototyping
Figure 1 shows our first prototype. This prototype helped us to figure out the layout of the signs and that the Bike Lane signs needed to be raised to create a more comfortable back support. Figure 2 shows a small scale of the Bike Lane Bench. This prototype helped us to roughly figure out how the frame of the bench would fit with the signs. Figure 3 shows our Autocad of the frames of the benches. This prototype took into account actual lengths of the pipes. Figure 4 shows our last prototype before building. This prototype was originally supposed to be the beginning of the final product but in building we learned that when making a closed loop with piping, a special connector or backwards threads are needed. This lead us to our decision to weld the joints.
Costs
Itemized summary of costs
Quantity | Material | Cost ($) | Retail Total ($) | Team FMLD Total ($) |
---|---|---|---|---|
22 | Custom cut 3/4" galvanized pipe | 166.25 | 166.25 | 166.25 |
10 | 3/4"x 1 1/2" galvanized nipple | 1.39 | 13.90 | 13.90 |
10 | 3/4"x 6" galvanized nipple | 2.79 | 27.90 | 27.90 |
20 | 3/4" Ts | 3.89 | 77.80 | 77.80 |
8 | 3/4" 90s | 2.29 | 18.32 | 18.32 |
8 | 3/4" Flanges | 6.99 | 55.92 | 55.92 |
8 | Street Signs | 38.75 | 38.75 | 38.75 |
1 | Cold Galvanizing Compound Spray | 8.47 | 8.47 | 0.00 |
3 | Pipe Strap (Packs of 10) | 1.49 | 4.47 | 0.00 |
2 | Drill bit | 4.99 | 9.98 | 0.00 |
60 | Various screws (stainless) | Varied | 54.94 | 0.00 |
65 | Various nuts (stainless) | Varied | 27.64 | 0.00 |
130 | Various washers (stainless) | Varied | 7.02 | 0.00 |
Retail Total (with tax) | $546.56 | |||
Team FMLD Total | $400.00 |
Poster
Below is the final poster that Team FMLD created
Testing Results
The upcycled benches can support a number of individuals and can withstand the punishement of middle schoolers. It is currently placed at Zane Middle School.
How to build
Use Template:How_to
Maintenance
Introduce this maintenance section.
Schedule
- Every 2 years
- Welded joints must be sprayed with Cold Galvanizing Compound Spray to prevent rusting.
Instructions
This is how to maintain. The step by step how to template {{How to}} is most likely best for this part.
Discussion and next steps
Suggestions for future changes
This is where to lay out suggestions for how to make the project function better in the future.
References
See Help:Footnotes for more. Template:Reflist