Line 53: Line 53:
*Needs proposed completion column as well as an actual completion column '''NEEDS UPDATING'''
*Needs proposed completion column as well as an actual completion column '''NEEDS UPDATING'''
====Costs====
====Costs====
*Good start - keep updated
*Good start - keep updated '''NEEDS UPDATING'''
*Consider a total $US column '''DONE'''
*Consider a total $US column '''DONE'''
*Add any donations  
*Add any donations  

Revision as of 23:45, 27 June 2014

Notes for Improvement

  • If you would like to make an image with a caption include "thumb" in the code. Resizing can also be done by adding a pixel number (I used 600px for your main image)
  • Click edit on this page to see example:
Current Las Malvinas Community Center Shade Structure

Abstract

  • Good start... keep this updated as project progesses
  • Abstract should not contain any information that is not mentioned throughought the rest of the project page... it only summarizes (like a research paper) DONE

Background

  • Add the local name of the community center in Las Malvinas DONE
  • Consider revising sentence structure DONE
  • Include information from abstract here... abstract should not contain any information that is not mentioned throughought the rest of the project page (like a research paper) DONE
  • Go into detail about "local materials" that are available here DONE

Problem Statement

Criteria

  • Take out entire line for "Cells left-aligned, table centered" DONE
  • How code should look (click edit to see):
Criteria Constraints Weight (0-10)
Costs must be under $400 USD 8
Aesthetics must be pleasing to the eye and look professional and natural 7
Durability must be able to withstand the test of time, light vandalism and misuse, and fire 9
Weather must be able to withstand hurricanes, caribbean rain storms, and caribbean sun exposure 10
Protection must be able to protect occupants from rain and sun 10
Locality/Maintainability must be made from local and accessible materials and be easily and cheaply repaired 7


Construction

Timeline

  • Needs proposed completion column as well as an actual completion column NEEDS UPDATING

Costs

  • Good start - keep updated NEEDS UPDATING
  • Consider a total $US column DONE
  • Add any donations
  • Once budget is complete expand on your introduction

How To/Design

  • Good start on the how to section, but it should be visible on your main project page. DONE
  • Good designs images.
Cookies help us deliver our services. By using our services, you agree to our use of cookies.