= Fort Custer =
= Fort Custer =


     SWMMBA works to maintain the trails at Fort Custer Recreation Area. The original Fort Custer trail layout has had great issue coping with the erosion caused by use and especially by rain. In many places the trail was built right along fall lines, meaning water runs directly on the center of the trail. This causes the trail to wear down, ruts to form, and sand and gravel to collect at the bottom of the hill, or at a turn in the trail. This is a unsustainable design, and poses a hazard to riders.
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;SWMMBA works to maintain the trails at Fort Custer Recreation Area. The original Fort Custer trail layout has had great issue coping with the erosion caused by use and especially by rain. In many places the trail was built right along fall lines, meaning water runs directly on the center of the trail. This causes the trail to wear down, ruts to form, and sand and gravel to collect at the bottom of the hill, or at a turn in the trail. This is a unsustainable design, and poses a hazard to riders.<br/>
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Through volunteer "Trail Days," SWMMBA has worked to make the Fort Custer trail system more sustainable, and better to ride.
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;Through volunteer "Trail Days," SWMMBA has worked to make the Fort Custer trail system more sustainable, and better to ride. Reshaping trail to allow for water to drain, armoring sections against erosion, placing barriers and signage to keep riders on the correct line, and rerouting sections of trail all while keeping the impact on the surrounding area to a minimum.


<gallery caption="Fort Custer Trail Days">
<center><gallery caption="Fort Custer Trail Days">
File:Erroded.jpg|Sample caption text.
File:Eroded.jpg|An eroded section of trail.
File:custer1.jpg|More sample caption text. This would look better with different images. :)
File:custer1.jpg|Wood armoring to protect the slope and allow for a smoother ride down.
File:Custer2.jpg|Even more sample caption text.  
File:Custer2.jpg|Armoring continued.
</gallery>
</gallery></center>


== Design ==
= Maple Hill Trail =


Describe your design here.
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;The Maple Hill Trail was built in Markin Glen Park over a period of approximately two years, opening in August of 2017. The more complicated sections were built by Alex Stuart of Spectrum Trail Design, payed for by SWMMBA fund raising and donations from local businesses and individuals. And the simpler pieces were constructed by SWMMBA volunteers. The trail was created from start to finish with sustainability in mind. The trail avoids fall lines and is angled to allow smooth water flow and prevent pooling. The trail is also build to accommodate riders of all skill levels to attract new mountain bikers and promote the growth of mountain biking in the region and in Michigan as a whole.


<!-- Here is a sample gallery.  -->
<gallery caption="Sample gallery">
<gallery caption="Sample gallery">
File:Imageneeded.png|Sample caption text.
File:Imageneeded.png|Sample caption text.

Revision as of 02:36, 21 March 2018

SWMMBA-logo.png

SWMMBA

     The South West Michigan Mountain Biking Association (SWMMBA) is a non-profit, volunteer run, organization that promotes mountain biking in Southwest Lower Michigan. SWMMBA has maintained the bike trail system at Fort Custer Recreational Area in Augusta, Michigan for over 20 years, and has recently finished construction of a new trail, the Maple Hill Trail at Markin Glen Park in Kalamazoo, Michigan.

Fort Custer

     SWMMBA works to maintain the trails at Fort Custer Recreation Area. The original Fort Custer trail layout has had great issue coping with the erosion caused by use and especially by rain. In many places the trail was built right along fall lines, meaning water runs directly on the center of the trail. This causes the trail to wear down, ruts to form, and sand and gravel to collect at the bottom of the hill, or at a turn in the trail. This is a unsustainable design, and poses a hazard to riders.
     Through volunteer "Trail Days," SWMMBA has worked to make the Fort Custer trail system more sustainable, and better to ride. Reshaping trail to allow for water to drain, armoring sections against erosion, placing barriers and signage to keep riders on the correct line, and rerouting sections of trail all while keeping the impact on the surrounding area to a minimum.

Maple Hill Trail

     The Maple Hill Trail was built in Markin Glen Park over a period of approximately two years, opening in August of 2017. The more complicated sections were built by Alex Stuart of Spectrum Trail Design, payed for by SWMMBA fund raising and donations from local businesses and individuals. And the simpler pieces were constructed by SWMMBA volunteers. The trail was created from start to finish with sustainability in mind. The trail avoids fall lines and is angled to allow smooth water flow and prevent pooling. The trail is also build to accommodate riders of all skill levels to attract new mountain bikers and promote the growth of mountain biking in the region and in Michigan as a whole.

Next level heading

You may need deeper level headings. Just keep adding equal signs to get that.

Costs

You may describe your costs here.

header 1 header 2 header 3
row 1, cell 1 row 1, cell 2 row 1, cell 3
row 2, cell 1 row 2, cell 2 row 2, cell 3

See Help:Tables and Help:Table examples for more.

Discussion

Your discussion.

Next steps

The next steps.

Conclusions

Your conclusions.

References


Contact details

Add your contact information.