==Team== | ==Team== | ||
The Las Malvinas natural building team, Practivistas 2015: | |||
*[[User: | [[File:Fuerte.jpg|thumb|left|The Powderpuff Girls. Plus Isabel and Lonny.]] | ||
* | *[[User:Henry Chinaski|Carley Bramhill]] | ||
*[[User:Lexington333|Lexie Folkerts]] | |||
*[[User:Ttg37|Tanya Garcia]] | |||
*[[User:Aen131|Allison Nerby]] | |||
*[[User:APenny6|Annette Penny]] | |||
*[[User:Kgv40|Kaileigh Vincent-Welling]] | |||
[[Category:Practivistas Dominicana Program]] | [[Category:Practivistas Dominicana Program]] |
Revision as of 04:06, 2 July 2015
Abstract
Background
This project was included in Lonny Grafman's Practivistas summer program through Humboldt State University HSU. It took place from May 22-July 4, 2015 in the small community, Las Malvinas, located in the outskirts of Santo Domingo, Dominican Republic. The task at hand was to finish the botica popular, which was built in summer, 2013, by other Practivista students Las Malvinas botica popular hullkrete 2013. Working with the community, seven Practivistas students designed and implemented this project based on the current criteria at hand. The project team was composed of a group of six students studying at Humboldt State University, all members of Lonny Grafman's Practivistas program. The project entailed making and applying plaster to the botica, laying out a floor for it, and providing materials needed for the electric plan of the building.
Objective
The objective of this project is to complete the botica popular in Las Malvinas in a way that best fits the criteria discussed, while hopefully providing the community with a finished product of what will become a reliable source of much needed medicine.
Criteria
English
The criteria below represents key aspects of this project in weighted form, which is a list of the key elements providing support and foundation to the design and building decisions made throughout. It stands as a guide to all decision-making for this project.
Criteria and Description | |||||
---|---|---|---|---|---|
Criteria | Weight | Description | |||
Safety | 10 | The structure must provide security for those using it as well as trust in the structure. It is also important that the materials used to create the structure cause no harm to the public, or less harm than the standard, given that necessary safety precautions are taken. | |||
Durability | 9 | The lifespan is suitable for the consumer given that the money needed to fix or replace the structure can be saved by the time the structure is in need. The structure is also able to withstand the extremes of average weather conditions. | |||
Environmental Impact | 9 | To have a less negative affect on the world than the standard that's commonly used. | |||
Aesthetics | 7 | Build a finished looking, smooth and trustworthy structure. | |||
Time | 6 | The importance of spending all of the constrained amount of time on a given project. | |||
Educational Value | 6 | The ability for the building to be easily understood and more deeply learned about and replicated if there was a desire to do so. | |||
Cost | 5 | The importance of spending all of the constrained amount of money on a given project. | |||
Accesibility of Materials | 5 | The time it takes to obtain a material must be within the constrained amount. As well the ability to transport the material should be taken into consideration for whether it can be carried or delivered in that set amount of time. |
Español
Criterio y Descripción | |||||
---|---|---|---|---|---|
Criterio | Importancia | Descripción | |||
Seguridad | 10 | Este estructura debe a proveer seguridad para aquellos que usar y también para confiar en la estructura. También es importante que los materiales usado para crear la estructura no causa nada lastima al público, o menos lastima de la norma cuando se toman las precauciónes apropriadas. | |||
Durabilidad | 9 | La vida de la estructura es apropriado para el cliente, dado que el necesario dinero para reparar o sustituir el estructura puede ser ahorrado al tiempo que es necesario. La estructura también puede resistir algunos de los corrientes extremos del tiempo. | |||
Impacto Ambiental | 9 | Para hacer efectos menos mál en el mundo y ambiento de la norma. | |||
Estética | 7 | Construir una estructura que ve terminada, suave y que puede confiar en. | |||
Tiempo | 6 | La importancia para usar todo del tiempo asignado para un proyecto. | |||
Valor Educativo | 6 | La abilidad para entender el edificio y aprender más y para replicar si la comunidad quiere. | |||
Costo | 5 | La importancia para usar todo del dinero asignado para un proyecto. | |||
Accesibilidad de Materiales | 5 | El tiempo necesario para obtener un material debe estar adentro de nos tiempo asignado. También, la poder para transportar un material debe estar pensando para saber si se llevar un material o debe estar poner en un carro para llevar adentro del tiempo asignado. |
Literature Review
See Las Malvinas Botica Popular 2015/Literature Review for the research done on this project.
Construction
How To
Apply Plaster
Below is a table describing a common method for plastering a wall. This table is built on the assumption that one has already gathered materials/supplies and have already made the plaster being used. Also note that there are many different methods of applying plaster to a wall; the following table describes one of these ways.
How to Plaster a Wall | |||||
---|---|---|---|---|---|
Steps | Instructions | Instrucciones | |||
Step 1 | Level Wall. This is done often in doorways and the tops of walls so that the applied plaster will be evenly distributed along the wall of interest's perimeter. | Ponga Nivel. Esto se hace en las puertas y arriba de las paredes para que el yeso aplicado será distribuido nivelado en el perímetro de la pared. | |||
Step 2 | Use the trowel to mix the water in with the plaster to ensure the correct consistency; Use the trowel to lift some of the plaster and drop it. Do this three times until you have a smooth consistency. | Usa la plana para mezclar el yeso para saber la consistencia correcta. Usa la plana para levantar unos del yeso y deja caer. Hágalo tres veces hasta que tienes una consistencia suave. | |||
Step 3 | Water down wall. This can be done easily by poking a hole through the cap of a water bottle and then spraying the wall. | Ponga agua en la pared. Esto puede hacerse pinchándola un aguajero a través del tapón de una botella de agua y luego rociar la pared. | |||
Step 4 | Use the trowel to lift some of the plaster and drop it. Do this three times until you have a smooth consistency, now scoop some plaster onto the backside of a trowel and place against wall at an upward, acute angle so that the plaster is in between the wall and the trowel. Apply pressure while pressing upward (sometimes at a diagonal direction) along the wall. Plaster should stick well to the wall. | Usa la plana para levantar alguno del yeso y después, bajalo. Hace este tres veces hasta tiene una consistencia suave, ahora ponga algunos del yeso en la parte posterior de la plana y póngalo en la pared en una ascendente ángulo agudo para que el yeso está entre de la pared y la plana. Aplica presión mientras se presiona hacia arriba (a veces en una dirección diagonal) a lo largo de la pared. Yeso debe pegarse a la pared. | |||
Step 5 | Smooth out small areas of plaster on the wall with a flat/rectangular trowel to give the plastered part a smoother/cleaner look and then repeat this and Step 4 until the entire wall is covered in a layer of plaster. | Suavizar las áreas pequeñas del yeso en la pared con la llana para dar a la parte enyesada una mirada más lisa y luego repita esto y el paso 4 hasta que la pared entera sea cubierta en una capa de yeso. | |||
Step 6 | When the wall is covered in plaster, let it dry a little bit for approximately 20 minutes. Less, the wall might be a little too wet for the next step; but more time, the wall will be too dry, making the next step difficult to tackle. | Cuando la pared está recubierta de yeso, déjele secar un poquito durante aproximadamente 20 minutos. La pared ppuede ser un poco demasiado mojada para el siguiente paso; con más tiempo, la pared será demasiado seca que hace el siguiente paso difícil para hacer. | |||
Step 7 | Smoothing time for the wall. When smoothing, the wall must be wet to use the wood float, but it's much easier to use a sponge to both wet, and smooth the wall. Using this method, push a wet sponge against the wall in circular motion. Little pressure is needed, but it depends upon how wet the sponge is (more pressure if less wet). The plaster should look blended together and well-distributed, giving the entire wall a smoother/leveled look. During this step, the plasterer must look out for uneven indents or spots on the wall and fill them using Step 4 and 5, if needed. The entire wall needs to be evened and mixed using this sponge method. | Tiempo del allanamiento para la pared. Cuando alisa, la pared debe ser mojada para usar la flota, pero es mucho más fácil usar una esponja para mojar y alisar. Usando este método, empuje una esponja mojada o húmedo contra la pared en el movimiento circular. Poca presión es necesaria, pero depende de qué mojado la esponja es (más presión si menos mojada). El yeso debería parecer mezclado juntos y bien distribuido, dando a la pared entera una mirada más lisa/nivelada. Durante este paso, el yesero debe buscar para marcas y llenarlos con el paso 4 y 5, si es necesario. Toda la pared debe ser nivelado y se mezclado con este método de esponja. | |||
Step 8 | When the plaster is dry, the wood levels can be taken down, and the wall can then be admired for eternity. | Cuando el yeso es seco, la estructura de madera pueden ser bajados, y la pared puede ser admirada entonces por la eternidad. |
How To
Plaster Test
The following table describes the two main tests performed on a dry, plastered wall. These tests will determine whether the plaster will be sufficient in providing enough strength and resilience to use on the wall.
How to Perform a Plaster Test | |||||
---|---|---|---|---|---|
Steps | Instructions | Instrucciones | |||
Step 1 | The first of two tests performed for checking if the plaster used is sufficient, is called the "water test". Using a water bottle with a hole in it's cap or side is most useful. Stand in front of the wall and apply pressure to the water bottle so that it is hitting the same place on the plastered wall for about 60 seconds. The duration and distance from the wall are dependent upon the pressure of the water source. The most important thing is to keep these parameters consistent between tests, in order to make meaningful comparisons. If there is no significant indent made in the plaster, the plaster passed the water test. If the water burrows a hole in the plaster, the size of the indentations can be compared. | La primera de dos pruebas funcionó para comprobar si el yeso usado es suficiente, es llamado la "prueba de agua". Usando una botella de agua o refresca con un agujero en la tapa o en el lado es el más útil. De pie frente de la pared aplica la presión en la botella (de agua o refresca) de modo que golpee el mismo lugar en la pared enyesada durante aproximadamente 60 segundos. La duración y la distancia de la pared son dependientes de la presión del agua. Lo más importante es mantener estos parámetros consistentes entre las pruebas, con el fin de hacer comparaciones significativas. Si no hay marca significativa hecho en el yeso, el yeso pasó la prueba de agua. Si el agua penetra un agujero en el yeso, se puede comparar el tamaño de los agujeros. | |||
Step 2 | For the scratch test, the second test performed, one must use a metal brush to apply a consistent pressure on the wall while pressing up and down 100 times. If this creates an indent or hole in the plaster, then the plaster used will not pass this test. As with the water test, the degree of failure can be compared to determine the most promising recipes to iterate upon. | Para la prueba de raya, la segunda prueba funcionó se debe utilizar un cepillo metálico para aplicar una presión constante en la pared mientras presiona hacia arriba y hacia abajo 100 veces. Si esto crea una marca o agujero en el yeso, entonces el yeso usado no pasará esta prueba. Como con la prueba del agua, el grado de insuficiencia puede compararse para determinar las recetas más prometedores para iterar sobre. | |||
Step 2 | Scratched the wall 100 times with the wire brush. Almost all of the plaster came off. | Rayado la pared 100 veces con el cepillo de alambre. Casi todo del yeso se cayó. |
Timeline
The following is a timeline composed of the tasks assigned and achieved as well as the dates.
Timeline | |||||
---|---|---|---|---|---|
Date | Tasks | ||||
28 May 2015 |
| ||||
29 May 2015 | Meeting with Eddie at Las Malvinas II
| ||||
03 June 2015 | Meeting with Gregorio and Enrique
| ||||
05 June 2015 | Made first iteration of caliche plaster recipe and applied to an inner wall of the Botica | ||||
06 June 2015 | UNIBE Architecture camping day | ||||
07 June 2015 | Research on plaster to decide on materials needed to purchase | ||||
08 June 2015 | Tested dried plaster on inner wall of Botica and gathered supplies | ||||
09 June 2015 | Made 6 different plasters to test that all include different materials such as two types of sand, flour, human hair collected from a local barber
| ||||
10 June 2015 | Research on flooring to decide on materials needed to purchase | ||||
11 June 2015 | Tested 6 plaster tests, gathered supplies for floors and plaster
| ||||
12 June 2015 |
| ||||
13 June 2015 |
| ||||
14 June 2015 | Plastered three interior walls, window frame, one outside wall and began plastering on two other outside walls | ||||
16 June 2015 |
| ||||
18 June 2015 | Continued plastering and smoothing in the botica | ||||
19 June 2015 | Ordered materials to use for the floor in the Botica since the previously purchased cement was used in plastering | ||||
20 June 2015 | Beach day, required relaxation | ||||
21 June 2015 |
| ||||
23 June 2015 |
|
Costs
The following table includes all purchases made to contribute to the Botica Popular. Items are listed multiple times according to how many times they were purchased. Some items were purchased at the same location and some were not.
Cost of materials | |||||
---|---|---|---|---|---|
Material | Source | Quantity | Costo (RD$) | Cost ($) | |
25 lb Harina | Colmado Genesis | 1 | 500 | 11.14 | |
Caja Plastica 2" | Ferreteria Cuesta | 4 | 60 | 1.34 | |
Pala Cuadrada | Ferreteria Cuesta | 2 | 760 | 16.93 | |
Nicholson Hoja Segueta | Ferreteria Cuesta | 2 | 74 | 1.65 | |
Bellota Llana P/AL | Ferreteria Cuesta | 2 | 440 | 9.80 | |
Flota de Madera | Ferreteria Cuesta | 4 | 164 | 3.65 | |
Flota de Goma | Ferreteria Cuesta | 4 | 140 | 3.12 | |
1/2 lb Clavos Acero | Ferreteria Cuesta | 1 | 28 | 0.62 | |
Martillo | Ferreteria Cuesta | 1 | 235 | 5.24 | |
Plywood 1/2" (4'x8') Okume o Brazil | Ferremix | 1 | 980 | 21.83 | |
Madera 1"x4" de 14' Bruta PinoAmer | Ferremix | 7 | 1505 | 33.53 | |
Cepillo de Acerco | Farmacia Carnina | 1 | 35 | 0.78 | |
Plana Albañil | Farmacia Carnina | 2 | 100 | 2.23 | |
Cubeta Plastica 4x5 | Farmacia Carnina | 2 | 300 | 6.68 | |
Cal de 10lb | Ferreteria Suazo | 1 | 60 | 1.34 | |
Cedazo para Albail de Madera | Ferreteria Suazo | 1 | 225 | 5.01 | |
Guantes Damas | Ferreteria Suazo | 3 | 135 | 3.01 | |
Plana China #7 | Ferreteria Suazo | 2 | 120 | 2.67 | |
Mascarilla Especial | Ferreteria Suazo | 7 | 420 | 9.36 | |
Cal Hidratada | Innova Centro | 2 | 576 | 12.83 | |
Funda de Cemento | Ferreteria Vasquez Martes | 6 | 1380 | 30.74 | |
Metero Cúbico de Arena | Ferreteria Vasquez Martes | 1 | 800 | 17.82 | |
1 Libra de Harina | Ferreteria Vasquez Martes | 4 | 80 | 1.78 | |
Guantes Industrial de Latex | Super Potente el Defensor del Bolsillo | 2 | 132 | 2.94 | |
Pítcher Plastico | Super Potente el Defensor del Bolsillo | 1 | 145 | 3.23 | |
Martillo | Ferremix | 1 | 315 | 7.02 | |
Martillo | Ferremix | 1 | 187 | 4.16 | |
Guantes | Ferremix | 2 | 290 | 6.46 | |
Lona de 3x4 | Ferremix | 1 | 490 | 10.91 | |
Cinta Metrica 8mts. | Ferremix | 2 | 400 | 8.91 | |
Mini-Pala P/Jardin | Ferremix | 3 | 240 | 5.35 | |
Galon de Gasolina (cocina la harina) | Propa Gas | 12.2 | 1000 | 22.27 | |
Scoba | Tienda Local | 1 | 125 | 2.78 | |
Guantes Damas | Ferreteria La Formula | 2 | 100 | 2.23 | |
Llana | Ferreteria La Formula | 1 | 225 | 5.01 | |
Libra Empañete | Ferreteria Local | 1/4 | 225 | 5.01 | |
Libra de Harina | Colmado Genesis | 4 | 80 | 1.78 | |
Libra de Harina | Colmado Genesis | 3.5 | 60 | 1.34 | |
Fundas de Cemento | Ferreteria Vasquez Martes | 7 | 1610 | 35.87 | |
Fundas de Cemento | Ferreteria Vasquez Martes | 7 | 1610 | 35.87 | |
Metero Cúbico de Arena | Ferreteria Vasquez Martes | 1 | 800 | 17.82 | |
Fundas de Cemento | Ferreteria Vasquez Martes | 9 | 1980 | 44.09 | |
Metero Cúbico de Arena | Ferreteria Vasquez Martes | 1 | 800 | 17.82 | |
Mascarilla Desechable | Ferrecentro Peque | 70 | 70 | 1.56 | |
Guante Motorista Trupper | Ferreteria Suazo | 2 | 120 | 2.67 | |
Alambre Picodo | Ferreteria Vasquez Martes | 2 | 80 | 1.78 | |
Disco Corte | Ferreteria "Santa Ana" | 3 | 615 | 13.70 | |
Barra Cuadrada 1/2x20 | Forjados del Caribe | 8 | 2407 | 53.60 | |
Perfil Negro 1x1 | Forjados del Caribe | 8 | 742 | 53.60 | |
Tola Negra Lisa 1/20 4x8 57lb | Forjados del Caribe | 1 | 1132 | 25.21 | |
Tola Negra Lisa 1/20x48x48 (Mitad) | Forjados del Caribe | 1 | 597 | 1329 | |
Cerr. Yale Italy 610-40 | Forjados del Caribe | 1 | 1097 | 24.43 | |
Pestillo -PL-5/8 M/Largo | Forjados del Caribe | 1 | 110 | 2.45 | |
Domastur, Mant. Gris Claro | Forjados del Caribe | 2 | 494 | 11.00 | |
Thinner 1/2 Boltella | Forjados del Caribe | 2 | 102 | 2.27 | |
Brocha Zeus 2" | Forjados del Caribe | 2 | 68 | 1.51 | |
Total | 28781 | 640.93 |
Cost of materials (Electric Supplies for Solar Team) | |||||
---|---|---|---|---|---|
Material | Source | Quantity | Costo (RD$) | Cost ($) | |
Tomacoriente Blanco | Ferreteria Cuesta | 8 | 544 | 12.12 | |
Alambre Electrica (200 pies) | Ferreteria Cuesta | 2 | 2080 | 46.34 | |
Bticino Caja Plastica | Ferreteria Cuesta | 5 | 135 | 3.01 | |
Caja T/GE Breaker | Ferreteria Cuesta | 1 | 420 | 9.36 | |
Tijera Forjada Corte | Ferremix | 1 | 210 | 4.68 | |
Tape Electrico | Ferreteria Cuesta | 1 | 47 | 1.05 | |
Caja Electrica 2x4 | Ferremix | 3 | 102 | 2.27 | |
Tubos 1/2x19 | Ferremix | 5 | 294 | 6.55 | |
Total | 3832 | 85.75 |
Tests
Plastering Day 1:Recipe
All measurements have been taken using a 5 gallon bucket with a 12 inch diameter. Some measurements are in inches some in centimeters for greatest degree of accuracy.
Todas las medidads estan echas usando un cubete de 5 galones con un diámetro de 12 pulgadas. Unas de las medidas estan en centímetros mientras otras estan en pulgadas para mayor grado de precisión.
Plastering Day 1 Recipe | |||||
---|---|---|---|---|---|
Componente | Amount | Español | Source = Fuente | ||
Flour = Harina de Trigo | 6 lb 4 oz | 6 lb 4 oz | Colmado en Las Mavinas | ||
Water = Agua | 3 gallons | 3 galones | Enrique y Marta | ||
Lime = Cal | 1/4 bucket = 2.75 inches from bottom | 1/4 de un cubete = 2.75 pulgadas del base | Ferreteria | ||
Caliche | 9.25 cm from the bottom | 9.25 cm del base | Donated by Vasquez | ||
Sand = Arena | Donated by Vasquez |
Plastering Day 1
Steps
See Botica Plastering Day down page for more accurate wheat paste plaster instructions
Plastering Day 2: Instructions
Caliche Plaster One | |||||
---|---|---|---|---|---|
Steps | Instructions | ||||
Step 1 | Boil water and mix in flour Hervir agua y sumar harina
|
Operation
This is how to operate. It should have a brief introduction and very useful images with labels. Also it may work best for your project to use the step by step how to template {{How to}}. See #Troubleshooting for an example.
Maintenance
Maintenance for the botica is fairly straight-forward. Since this building is so significant in the community, giving them access to cheap medicine locally, the utmost care must be given to the building. The building should be monitored for leaks on a consistent and normal basis... especially since the inner wall is covered in natural plaster, which didn't pass both plaster tests, so if exposed to weather, it can be degraded. Taking care of locking up the door at night and not letting children come play inside of the building can extend the life of its features as well.
Instructions
This is how to use and maintain it. The step by step how to template {{How to}} is most likely best for this part.
How To | |||||
---|---|---|---|---|---|
Image | Steps for completion | ||||
Backpack frame bike trailer |1 |Do something. | Aleiha's parabolic solar cooker |2 |Do something really complicated but made simple, etc. |
Conclusion
Testing results
Below, are the recipes used and results gathered from the different wall plasters applied and tested.
Ingredient | Type of measurement | Plaster 1 Qty | Plaster 2 Qty | Plaster 3 Qty | Plaster 4 Qty |
---|---|---|---|---|---|
Yellow Sand | qty | qty | qty | qty | qty |
Black Sand | qty | qty | qty | qty | qty |
Human Hair | qty | qty | qty | qty | qty |
Secante (AS 600 Dryant) | qty | qty | qty | qty | qty |
Flour Paste | qty | qty | qty | qty | qty |
Cement | Bag (90 lbs) | qty | qty | qty | qty |
Lime | Bag (approx. 1 5-gallon bucket) | qty | qty | qty | qty |
Scratch Test | Passed? | Passed? | Passed? | Passed? | |
Water Test | Passed? | Passed? | Passed? | Passed? |
Plaster Tests: Before and After | |||||
---|---|---|---|---|---|
Before | After Scratch Test | After Water Test | |||
Discussion
Both types of sand performed well when the recipe included secante and excluded a fiber. However, none of the recipes passed the water test adequately for outdoor use. It was decided that the fine sand recipe would be used for the indoor plastering, and a cement recipe would be used for the outside work.
Lessons learned
Discuss lessons were learned during this project and what you would do different next time.
Next steps
Discuss any next steps for the project as it goes on into the future.
Troubleshooting
This is only how to troubleshoot basic operation. For complex issues, the solution might just say contact ________. It should be a table in this format:
Troubleshooting | |||||
---|---|---|---|---|---|
Problem | Suggestion | ||||
Example issue | Example solution or suggestion | ||||
Does not turn on | Make sure it is plugged in | ||||
Another issue | Et cetera |