Created a small woven bag and pocket purse using practice paper.  
Created a small woven bag and pocket purse using practice paper.  
===10th June, 2015===
===10th June, 2015===
Received the [Filastruder https://www.filastruder.com/]. Built the plastic extruder and completed the wiring. Basic test of the extruder using provided ABS plastic pelts.
Received the [https://www.filastruder.com/ Filastruder]. Built the plastic extruder and completed the wiring. Basic test of the extruder using provided ABS plastic pelts.


===11th June, 2015===
===11th June, 2015===

Revision as of 04:24, 13 June 2018

Team with "Sunset" Bag

Abstract

This page outlines the Arroyo Norte waste plastic innovation from start to finish over the six week project that is all part of the Practivistas Dominicana program located in Santo Domingo, Dominican Republic. The project's goal was to use plastic present at the Arroyo Norte dump to create sell-able products by using small pieces of HDPE plastic and creating plastic strips create products using a plastic extruder. The final products include roses, bracelets, a small woven bag, and a large woven beach bag."

Background

The Arroyo Norte waste plastic innovation is a project created by the plastics team of the Practivistas Dominicana program. Practivistas is a summer program from Humboldt State University and is based in Santo Domingo, Dominican Republic. The program is six week course where the students work with underdeveloped communities in the Dominican Republic to help improve the quality of the lives of the community members through Appropriate Technology projects. The plastic innovation project is a collaboration between the Practivista program, Universidad Iberoamericana (UNIBE), and the community of Arroyo Norte. Arroyo Norte is a small community in Santo Domingo that is located next to Duquesa, the dumpsite for Santo Domingo. The excess of HTPE plastic located at the dump helped lead to the communities idea of the waste innovation project. The goal is to help reduce the amount of plastic in the dump and help boast the community's economy by collecting plastic, shredding it, making extruded plastic strips using a plastic extruder, making products using the strips, and selling them for profit to be put back into the project and the community economy. The plastic team is Rebecca Stark, Fernando Alberto, Luis Gonzalez, and Arroyo Norte community members.

Problem statement

The objective of this project is to work with the community of Arroyo Norte to design and create an upcycled, commercial products made from the HDPE plastic that are present at the Arroyo Norte dump to help boast the community economy and remove excess plastic from the dump.

Criteria

The table of criteria was created by the plastics team, with input from the Arroyo Norte community, and is used to make decisions for the project. There are constraints that must be met for every decision but the weight next to the criteria shows its importance to the team on a scale of 1 to 10 with 10 being the most important. This criterium help the main goals of the project be considered for every project decision.

Criteria Constraints Weight (1-10)
Time spent per unit Less than 2 hours to make each product (less is better) 7
Profit per unit At least profitable after deducting costs (labor, materials, electricity, and transportation) (more is better) 10
Ease of production A person with basic education can make products 8
Product Aesthetics At least 6/10 people like product (more is better) 7
Sell-ability At least 10 products sold per week (more is better) 9
Total project cost (Research and Development) No more than $1,000 spent (less is better) 3
Environmental impact At least 20 lbs of plastic removed from dump per month (more is better), less energy usage than traditional plastic manufacturing (less is better) 7
Product quality Product must stand up to product testing 10

Literature Review

The literature review has all of the reasurch information done by the plastics team. This information is used to help the team make decisions through out the project. There is information on types of plastics, plastic extrution, weaving, rural community economics and examples of similar projects. The literature review can be found here.

Creating prototypes

Cleaning/Cutting Process

Step 1. Cut the pre-washed plastic waste

Error in widget YouTube: Unable to load template 'wiki:YouTube'

| Cut the pre-washed Plastic waste

Step 2. Clean as many times as possible

Error in widget YouTube: Unable to load template 'wiki:YouTube'

| Clean, clean, and clean some more

Step 3. Cut and Clean some more

Error in widget YouTube: Unable to load template 'wiki:YouTube'

| The smaller the pieces (preferably<1mm) better for extrusion


Making a Rose

Error in widget YouTube: Unable to load template 'wiki:YouTube'


Overview of the Innovation with Plastics

Timeline

Below is the completed project timeline, which outlines what was accomplished each day.

28th May, 2015, Thursday

Built the plastic innovation team.

29th May, 2015

Researched and worked on Literature Review. Main topics include plastic, plastic extrusion, weaving, community economic development, and similar project examples.

01st June, 2015

Met with the plastics innovation team. Created project criteria and added to appropedia page. Discussed project ideas and goals.

03rd June, 2015

Met with Arroyo Norte community members. Made list of materials needed to both purchase and obtain from the community. Made a project schedule and itinerary for the next meeting

08th June, 2015

Researched and learned to make a basic woven bag.

09th June, 2015

Created a small woven bag and pocket purse using practice paper.

10th June, 2015

Received the Filastruder. Built the plastic extruder and completed the wiring. Basic test of the extruder using provided ABS plastic pelts.

11th June, 2015

Searched for someone to customize extruder nozzles to create plastic ribbons. Had many failed attempts, new nozzles were needed.

12th June, 2015

Continued search for new nozzles, which ended with finding similar ones and purchasing them. After searching found new machine experts and made the appropriate customization for the nozzles. Set up the extruder with the new customize nozzle and made the first ribbon strip. Met with the community at Arroyo Norte Made a future tentative schedule for time spent in Arroyo Norte (Thursdays and Sundays). Made early diagnostics on the broken extruder (not well mounted to the board).

13th June, 2015

Went to Arroyo Norte in the morning to pick up plastic however plans changed because of lack of shredded HDPE plastic at dump. Collected and cleaned HDPE plastic bottles. Found a local disposal site that shredded the cleaned bottles for free. Picked up supplies to repair the extruder. Cut some of the HDPE plastic into smaller pieces using scissors.

14th June, 2015

Finished repairing the extruder. Went to go work with the extruder at Arroyo Norte but had issues of electrical wiring, mechanic assembly or power intake. Washed more plastic bottles.

17th June, 2015

Group meeting to recollected, reorganize, refocus on our priorities given the project time frame.

18th June, 2015

Continued to make strips, Cut different sized holes out of extra nozzles to see which size of slit would create the best strips.

19th June, 2015

Went to Arroyo Norte to shred more plastic. Looked for a company that shreds plastic. Shredded more plastic,

20th June, 2015

BEACH DAY- Mandatory day off.

21st June, 2015

Went to Arroyo Norte, Made color plastic strips by experimenting experimenting with adding cut up colored hdpe plastic bottle caps (found on soda and water bottles).

22nd June, 2015

Bought color plastic pellets and began to extrude large amounts of colored strips. Experimented with using a water bath to cool down the plastic to get the desire thickness and consistency of the plastic strips.

23rd June, 2015

Went to Arroyo Norte and a community member began to produce a small woven bag using a wooden mould. Continued to experiment with the water bath. Test were interesting but best method continued to be to let the strips fall to the floor from the extruder without any pulling, most consistent method.

24th June, 2015

Visited a maker-space Santo Domingo.

25th June, 2015

Went to Arroyo Norte to produce strips but ended up having to leave early because of the electricity went out. Made more strips at Luis' house. Finished the small woven bag. Tried to make plastic roses using hot extruded plastic, not very successful.

26th June, 2015

Spent day making strips. More work on roses, came up with a good process to make small plastic roses.

27th June, 2015

Went to Arroyo Norte, presented the finish bag and continued making strips. Electricity went out at 2:30pm, which ended work in Arroyo Norte. Went to Luis’ house and made a new mould for a bigger bag and produced a large amount of strips of varying colors. Worked on making basic bracelets to sell. Created by cutting extra strips to the correct length, heating the ends of the strips with a hot air blower and then clamping the two ends together using pliers.

28th June, 2015

Spent all day making strips and starting a large woven beach bag.

29th June, 2015

Finished making strips for and building the Sunset beach bag. More bracelets and roses made.

30th June, 2015

Last visit to Arroyo Norte, showed finished prototypes and said goodbyes. Presented the project to a near bye teacher. Began to work on final presentation.

1st July, 2015

Continued to work on final presentation and the project Appropedia page.

2nd July, 2015

Completed a simple presentation, and presented at Las Malvinas.

3rd July, 2015

Finished final presentation and presented at UNIBE. Sold bracelets for 50RD each and made 800RD to be used for the project. End of project and program.

Budget

Table of all money spent on project. This is not recreation costs as some money was spent on research and development.

Cost

Materials Unit Price $(DOP) Quantity Cost $(DOP) Cost $(USD)
Extruder 18,428.00 1 18,428.00 410.00
Customized Nozzle/Dies 800.00 1 800.00 17.80
Shred Plastic Service N/A 1 300.00 6.67
Allen Wrench 112.00 1 112.00 2.49
Practice Weave Paper 245.00 2 490.00 10.90
New Nozzle/Dies 36.00 5 180.00 4.00
Large Level 250.00 1 250.00 5.56
Small Level 179.00 1 179.00 3.98
Small 90deg Brackets 119.00 1 119.00 2.65
Large 90deg Bracket 70.00 3 210.00 4.67
Aluminum Mesh Net 230.00 2 460.00 10.23
Scissors 26.00 1 26.00 0.58
Cholorine 90.00 1 90.00 2.00
Sand Paper 30.00 1 30.00 0.67
Duct Tape 65.00 1 65.00 1.45
Wood Screws 0.80 10 8.00 0.20
Electrical Wire 6.00 2 Ft 12.00 0.27
Electrical Tape 112.00 1 112.00 2.49
Customize Nozzle/Dies 800.00 2 1600.00 35.60
PVC 2x19 Tubing 309.15 1 310.00 6.87
PVC Cap 1-1/2" 16.00 2 32.00 0.71
PVC Cap 2" 17.00 2 34.00 0.76
Drill Bit 70.00 1 70.00 1.56
Garden Scissors 210.00 1 210.00 4.67
Wet-Dry Cement 128.00 1 128.00 2.85
5 Lbs. of Color Plastic Pellets 400.00 1 400.00 8.67
Heavy Duty Garden Scissors 845.00 1 845.00 18.78
Total Cost $25,500.00 $567.08

Operation of extruder

  1. Plug in extruder
  2. Flip switch closest to control box up (should see the box light up)
  3. Set temperature on control box and wait for the extruder to reach that temperature
  4. Once set temperature is reached wait 10 minutes for all plastic to melt
  5. Flip the second switch (motor will begin to rotate)
  6. Plastic will begin to extrude, in the beginning it may be necessary to pull the plastic with a pliers till the weight of the plastic can keep it strait (about 1 foot)

Extruder Building Instructions

Below is the building instructions for the Filisruder kit. These step by step instructions should be used with the Filistruder instructions and the wiring is not included. The link to the instructions is included here.

File:Kit1.jpg
How to Construct Filistruder Kit

Conclusion

Final prototypes

Testing results

Describe the testing results.

Discussion

Discuss the testing results.

Lessons learned

  • When weaving with thick plastic a mould is need
  • The plastic pieces need to be cleaned very well before being put into the extruder
  • The smaller the plastic pieced are the faster the extruder extrudes the strips
  • Arroyo Norte only has power from 11-4 pm during the day and still sometimes goes out during that time

What we wished we did

  • Worked more days in the community to get more community involvement
  • Ordered the extruder earlier to have more time to make prototypes

Next steps

  • Buy a larger extruder to increase plastic strip production
  • Find a better process for cleaning the waste plastic
  • Build a shredder so the community can shred their own plastic
  • Have thinner strips either from pulling by hand or a hand-crack winder
  • Use solar panels to power the extruder
  • More community involvement
  • Testing prototypes for durability

Troubleshooting

For small issues with the extruder please look at the table below for the solutions. If your problem is not listed or the solution does not solve the problem please contact Luis Gonzalez at gonzgarcia.luis@gmail.com , Rebecca Stark at rds334@humboldt.edu , or Fernando Flores at faf34@humboldt.edu.

Problem Suggestion
The control box does not turn on after flipping the power switch. Check that it is plugged in and check all wiring connections.
The temperature is not increasing even when power is on. It takes a few minutes for the temperature to start increasing. If it still is not increasing after 3 minutes check the the thermocouple is still in the nozzle and that the other end is connected to the control box.
The barrel is rotating after turning on motor Turn of motor and wait 10 more minutes for the plastic to melt. When ever turning on the extruder you need to wait 10 minutes after it has reached temperature to start extruding plastic.
The red light comes on on the stall protection board. There is three possible problems. The first is that plastic pieces being put into the extruder are to big, cut them smaller. Next check under the hopper to see if plastic pieces are jammed between the barrel and the screw, if so remove with pliers. The final cause is that the everything is to tight. Try to loosen the brackets from the board.
The plastic is coming out very slow. There is a few possible problems. The first is that the plastic needs more time to melt so turn off the motor and wait 5 minutes with the power on. Another possibility is that the plastic pieces are to big, cut them smaller. The nozzle may be need to be cleaned. Finally it could be low electricity, check your outlet.
The temperature goes down after turning on the motor. A small fluctuation is nothing to worry about(20 degrees change). Anything larger could mean an issue. First try to let the extruder heat up for a bit longer before turning in the motor (about 5 minutes). Next check that the thermocouple is still on the nozzle. A final issue could be that wind is blowing onto the thermocouple so pull the insulation forward till it is covering the part where the thermocouple is connected to the nozzle.
Rough edges on plastic strips If you are pulling the plastic then try to pull less. If not then the nozzle is dirty and needs to be cleaned. The easiest way is to heat up the extruder like normal but not turn the motor on and then take a needle and run it along the outside edge of the nozzle cutout. Then turn on the motor and let a bit of plastic come out. Turn of the motor and repeat this process a few times.
Lines on the plastic strips Then the nozzle is dirty and needs to be cleaned. The easiest way is to heat up the extruder like normal but not turn the motor on and then take a needle and run it along the outside edge of the nozzle cutout. Then turn on the motor and let a bit of plastic come out. Turn of the motor and repeat this process a few times.

Team

References

See literature review for references.