Time to speak up! Want to ask the Appropedia community for help, or help other users? Visit Appropedia:User requests. Has Appropedia been useful? Tell your story here
Introduction to making the Full Belly Project Universal Nut Sheller
From Appropedia
(Redirected from Introduction to making the FBP UNS)
| Instructions for Making FBP Universal Nut Shellers |
|---|
| 1. Introduction |
| 2. Assembling the stator mold |
| 3. Assembling the rotor mold |
| 4. Mixing and pouring concrete |
| 5. Removing parts from molds |
| 6. Assembling shellers |
| 7. Adjusting and testing shellers |
| 8. Troubleshooting |
Based on the kit available from the Full Belly Project
[edit] The steps in building a sheller are:
- Assembling the molds for each part.
- Mixing and pouring the concrete into the molds.
- Removing the parts from the molds.
- Assembling the sheller.
- Adjusting and testing the sheller.
- Troubleshooting.
Special Note: All the parts are named and numbered. The directions will refer to both the name and number of each part. The part name will be in bold.
The stator and the rotor are the two parts of the sheller that you will make and put together. The rotor is mounted in the stator.
